Water Protectors Shut Down Pipeline Construction In Wisconsin
By Staff from Makwa Initaitive. Water Protectors from the Makwa Initiative halted the last piece of construction for the Wisconsin section of Enbridge’s proposed Line 3 pipeline project. Two water protectors locked themselves to construction equipment halting work at the site.
Police arrived approximately 15minutes after the lockdown began. At this time there are 2 Water Protectors known to be under arrest in Superior, WI and 2 Water Protectors still locked onto machinery. A water protector stated, “We have attended public hearings, marches, and rallies. At this point we feel like the only way we can make are voices heard is by locking our bodies to the equipment. The state has recorded our comments, catalogued them, and say they factor them into their decision on whether or not to permit the project. We want them to stop expanding tar sands infrastructure. We need to be thinking about our children’s futures.”