Protestors Lock Selves To Pipeline Trucks
At about 7:30am this morning, two men locked their necks with bicycle U-locks to a pipeline construction truck, immobilizing it, as it was exiting a Precision pipeline storage yard at 3565 East Lakeville Road. This action has resulted in a back-up of trucks that have been blocked from exiting the pipe yard. At the time of this writing, there is a police presence around the two persons locked to the truck as well as dozens of other supporting protestors.
Precision Pipeline, who runs the pipeline storage facility, is hired by Enbridge to expand Line 6B. In 2010, Line 6B ruptured in Marshall, MI spilling over 1 million gallons of toxic tar sands and diluents into Talmadge Creek, impacting 40 miles of the Kalamazoo River. Four years later, Enbridge states that the Kalamazoo River is the cleanest it has ever been while dragging its feet in clean-up efforts. Simultaneously, Enbridge states that the river will never be completely clean, and has meanwhile been expeditiously expanding the 6B pipeline system to carry a higher capacity of tar sands oil.
Acting to disrupt Precision Pipeline, 20-year-old Duncan Tarr and 21-year-old Dylan Ochala-Gorka, both Michigan residents and organizers with a group called the Michigan Coalition Against Tar Sands (MICATS), demand a halt to Enbridge’s expansion of line 6B as well as restitution for those still suffering from effects of the 2010 tar sands disaster.